Seven Sisters Phase 3: 200m of 900mm SDR 26 PE 100
It is always satisfying to see the pipe emerge at the winch!! Last week the final 200m of 900mm SDR … Read more
Case Study: London, Large Diameter, Phase 2
Project Details Our most exciting and challenging project to date! Phase 2 of the Award Winning Seven Sisters rehabilitation project … Read more
Case Study: London, Large Diameter
Project Details This was a tremendously exciting project with some extraordinary challenges. In an industry first, a 900mm SDR 21 … Read more
Case Study: Finspångsgatan, Solna, Stockholm
Project Details Client: NCC for Norrvatten Location: Finspångsgatan, Solna, Stockholm Completion date: December 2021 Pipeline Length: 600m Liner material type: … Read more
Case Study: Kongsberg Norway
Project Details Client: Pipeliner AS Location: Kongsberg, Norway Completion date: July 2020 Pipeline Length: 365m Liner material type: PE 100 … Read more